FAQs
More FAQs- How long will it take to have my floors coated with acrylic?
- Do I have to move furniture before the carpet cleaning?
- How do I maintain the floor after the acrylic application?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
To get the best results with professional carpet cleaning, we recommend removing furniture from the rooms we will be cleaning. Items we clean around instead of moving include file cabinets, conference room tables, bookcases, lobby furniture and large pieces of furniture.
Leave the daily cleaning to the professionals at ServiceMaster Clean Of Etobicoke. We offer daily, weekly or monthly cleaning services for your facility. If you should choose to do some of the cleaning yourself, pre-clean the floor in order to get all of the particulate soils off the floor such as dirt and sand, then mop the floor with a neutral cleansing agent and preferably a microfiber mop. Make sure to change the water and rinse the mop frequently to prevent the mop from leaving soil behind.